Templates for file requests
Set up reusable file requests for documents you ask for again and again, such as a meter photo, a heating-system label, an ID copy or proof of ownership. Customers upload them through the customer portal or the Energy House lead funnel.
Who this is for
Admins who set up the automatic file requests for the Energy House funnel, and team members who create file requests on individual customer projects.
Before you start
- You need the Admin role to open the File request templates settings page, where the automatic file requests live. If you can't open it, ask an Admin.
- The Energy House funnel is available on residential projects. Per-project file requests work on both residential and commercial projects.
- For per-project requests, the customer portal must be activated for the project.
- Have example images ready where possible. An example photo comes with each Energy House request and shows the homeowner exactly what to capture.
Set up automatic file requests for Energy House
These requests appear automatically after a homeowner submits the public Energy House form.
- Open Settings > Customer communication > File request templates and scroll to Automatic file requests.
- Click Add (the + button, top right). A new inactive draft request opens for editing.
- Fill in Name (max 50 characters), for example Meter cabinet photo. This is the label the homeowner sees.
- Add a Description (max 150 characters, optional) that says what to photograph.
- Drop an Example image into the upload area (image files only). The homeowner sees it as a visual guide.
- Set Display for: the component packages this request applies to (Solar, Storage, Wallbox, plus Heatpump on heat-pump-enabled accounts). The request only appears to homeowners who selected one of these.
- Set Required for: the packages where the upload is mandatory rather than optional. You can only mark a package as required once it's selected under Display for.
- Click Save. Saving an active request asks you to confirm. An inactive draft saves directly.
- Back in the list, switch the request to active with the on/off switch to make it live, and confirm "make public".
To change the order homeowners see requests in, drag the rows. To remove a request, use the row's Delete action. Click Preview (the eye button, shortcut p) to see exactly which requests a homeowner gets for each package.
After submitting the form, the homeowner sees the requests on the status page as the Upload files card, which changes to Files uploaded once complete. A Tip: tile with a QR code opens the same page on their phone. Once every required file is in, a green prompt with Next takes them on to the consultation step.
For the rest of the funnel, see Generate leads with the public Energy House configurator.
Request files on a single project
Use per-project requests for customers who don't come through the Energy House funnel, such as walk-in leads and referrals, and for mid-project asks or handover photos after the deal.
- Open the customer's project in the Reonic Portal.
- Go to Files / File Requests.
- Click New File Request.
- Fill in Title with what the customer should upload.
- Click Add description to add optional text. The customer sees it formatted, so links work.
- Set Allowed file types: Image, PDF, CSV, Excel, or a combination.
- Turn on Allow many if the request accepts more than one file.
- Click Create. The request is added to the project's File Requests list as a draft, which the customer doesn't see yet.
- In the File Requests list, use the request's send / publish action. The request now appears in the customer's portal under File Requests.
The customer uploads from the portal. The upload appears in the project's file area marked as customer-uploaded, and the customer can see it too. A request shows a blue check and loses its Required tag as soon as it has an upload. When every request has an upload, the customer sees "All done. Thank you!".
Things to know
- Energy House requests follow the homeowner's selection. A request set to Display for Solar only shows to homeowners who picked a solar package. Required for is set per package, so the same request can be optional for Wallbox and mandatory for Solar. A solid badge means required, a dashed badge means optional.
- Changes apply to new submissions. Switching a request off stops it appearing on new submissions. Requests already sent stay as they are. A deleted request stays valid for offers already created and stops showing for new ones.
- Lead-only mode. If your account runs the funnel in lead-only mode, the homeowner finishes on the Thank you for your inquiry screen instead of the status page. The same status page also appears inside the customer portal.
- One file or many. With Allow many on, the customer can drop up to 20 files at a time and the drop zone stays open. With it off, the customer uploads one file and the drop zone closes once the request has an upload. The drop zone accepts only the file types you allowed. A failed upload shows the message "Error during file upload".
- Customers can correct a wrong upload for 5 minutes. Within 5 minutes of uploading, the customer can delete the file and upload again. A tooltip counts down the time. After that the file is locked, and the customer is asked to contact your company to remove it.
- Follow up yourself. If the customer hasn't uploaded within the time you expect, contact them directly.
- Examples on per-project requests. To show the customer an example, describe it or link to one in the Description.
Last updated on