Services
Complete the MCS handover pack
Build the Part 5 handover pack for a UK job as one PDF, with most sections filled from the steps you have already completed.
Estimate heating and hot-water demand (MIS 3005)
Produce the MIS 3005 space-heating and hot-water figures for a UK air-source heat-pump job, with an indicative heat-pump capacity, the seasonal performance factor and a high/low consumption estimate.
File an automatic DNO application
Submit the G98 or G99 grid-connection application to the network operator from the MCS paperwork, and track its status, correspondence and commissioning in Reonic.
Prefill an MCS step from an uploaded PDFAI feature
Upload a completed MCS form and have its values read into the step's fields for you to check, instead of copying them across by hand.
Run the structural wind-load check
Check that your fixings hold against calculated wind uplift and keep the result on the offer variant as MCS evidence.
Photogrammetry
Turn drone photos of a customer's roof into a measured 3D model you can plan solar against. Reonic processes the imagery automatically: you upload the photos, wait, and import the finished model into your residential planning.
Planning Service
Hand the 3D solar planning on an offer to Reonic, then review and accept the result.