Reonic

Plan additional components on an offer

Add services, non-PV hardware, or third-party trades-work: items that count in the total price but not in the simulation.

Additional components have no technical data for the simulator to read. They flow into the total price and the customer's PDF but leave the simulation (yield, self-consumption, payback) untouched. This applies to residential offers.

Who this is for

Account managers and installer admins (editor role or higher, with access to Offers) planning offers that include trades-work, services, or supplementary hardware alongside the simulated PV, battery, heat-pump, and wallbox layers.

Before you start

  • The offer must be in draft state. Once a signature request is sent, that snapshot is locked. To add components again, withdraw the request, let it expire, or duplicate the variant.
  • Have the components ready in your components library, or add them inline. Library-first is cleaner: you reuse the price and description across offers.
  • If you frequently add the same set of items, prepare an additional-components package (a saved bundle) so two clicks bring the whole set into an offer. You can also pre-select one when you first create the offer. See Create an offer.

When to use additional components

The dividing line is simple: if an item feeds the simulation, it belongs in its own planning section, where the simulator reads its technical data. Everything else is an additional component.

  • Simulated: PV modules, batteries, heat pumps, wallboxes. Plan these in their dedicated sections so the yield and self-consumption math recalculates. See Plan battery storage and Plan wallboxes and EV charging.
  • Additional: everything with no simulation data. Common cases:
    • Trades-work: electrician's day rate, scaffolding rental, third-party labour, site-prep.
    • One-off items: roof-tile replacement, chimney repair, custom mounting hardware.
    • Backup-power hardware: battery-inverters with backup, transfer switches, generator interfaces.
    • Energy-management systems and gateways: SMA Sunny Home Manager, openWB controllers, smart-meter gateways, EMS hubs.
    • Monitors and displays: in-home energy displays, third-party monitoring hardware.
    • Electrical cabinets and sub-panels.
    • Pure trades quoting: non-PV projects you quote and invoice from the same offer flow.

Add additional components to an offer

  1. Open the offer's Planning view.
  2. Scroll to the Additional components section.
  3. Click + Add to insert components one at a time, or import an additional-components package if you've prepared one.
  4. Pick the component from your library, or enter a custom line with title, quantity, and price.
  5. Adjust the quantity if needed.
  6. Confirm the price (inherited from the library, or set inline).
  7. Click Save.

The components land in the variant's bill of materials and the total price updates immediately. There's no simulation re-run.

Plan backup power

Backup-power hardware is the most common use of additional components where grid stability is a buying motivation. Add each piece as a line item:

  1. The backup-power module (e.g. a battery-inverter with backup function, or an automatic transfer switch).
  2. A changeover or manual transfer switch, if the installation needs one.
  3. Any cabling or sub-panel hardware the electrician will install.

Backup power typically covers selected circuits (fridge, lights, internet) during an outage, not the whole house. When a customer asks how long the battery will last, give a realistic verbal estimate: it depends on battery capacity, the load during the outage, and the inverter's backup rating.

Plan energy management systems

Add EMS hubs, smart-meter gateways, and communication modules (Modbus adapters, cellular gateways, Wi-Fi extenders) as additional components. Reonic plans the hardware. Configuring the EMS (e.g. prioritising the wallbox over the heat pump on surplus PV) happens after install, in the vendor's app.

Effect on the customer's PDF

Additional components appear in the bill of materials and the total price; the simulation pages (production, self-consumption, profitability) leave them out.

If an offer contains only additional components (no PV, battery, wallbox, or heat pump), the PV-specific pages (yield chart, self-consumption) have nothing to render and drop out. The Economics/payback page isn't dropped automatically, though: whether it's included depends on the offer's PDF page settings and whether the offer includes financing. For a clean trades quote (cover, bill of materials, total, signature), turn off the economics and simulation pages in the offer's PDF settings, or ask your Reonic account manager about a trades-only PDF template.

How pricing flows

Additional components inherit their price from your components library on insertion. If you later change a library component's price, Reonic flags the inserted line and lets you refresh it to the new price with one click.

Discounts work the same as for any other component. See Global discounts and Discounts per section. Two points that matter for additional components:

  • Rebates apply at the section or document level, not to an individual line. You can still adjust the quantity on any line, and the line total recomputes.
  • On the customer's Components Overview page each component shows its unrebated list price, and any rebate appears on its own row beneath the components with the discounted total at the bottom, so the customer sees the discount clearly rather than a silently reduced line price. Check the customer-view preview before sending.

What the customer sees per line is governed by the price-display mode (grouped subtotals, every line itemised, or a single total only). Local mode ("Activate local mode") only blanks prices and margins on your own screen during an on-site visit and changes nothing in the customer's offer view.

Things to know

  • They stay out of the simulation but still count as cost. Additional components never appear in an energy-flow chart, and adding one never triggers a re-simulation. They do count as cash the customer pays, so they lengthen the payback. If you're still iterating on PV or battery, plan additional components last.
  • They do flow into the financing variant's total. On a financed variant (Bees & Bears, EOS), the additional-component cost is part of the financed amount, and financing partners see the gross total. Financed components use the partner's interest rate and don't always honour a flat-percentage rebate, so check the rendered PDF before sending.
  • Margin visibility is its own user right. A colleague without that right sees additional-component lines without your margin. If someone reports seeing a margin figure they shouldn't, check their access right.
  • Editing VAT and editing price are two separate rights. Setting or removing the VAT on a planned component (e.g. dropping it to 0%) is gated independently from editing the price; most users need the price-editing right for either. If you can't edit VAT on a planned component, ask your admin for the price-editing right.
  • Wallbox-related hardware can sit in Wallbox or Additional. The wallbox itself goes in the Wallbox planning section so the simulator picks up the EV load. A brand-specific load-manager can live in either section; for brand-agnostic load-managers (SMA, openWB), Additional components is the cleaner home.
  • The bill of materials is one shared list. PV, battery, and additional components all merge into one BOM on the PDF. The customer sees the split only if your PDF template surfaces it; internally you always see it.
  • Quantities are per-line. Sell scaffolding by the day, set quantity to days; labour by the hour, set quantity to hours. A clear title ("Electrician on-site, 8 h") reads cleanly for the customer.
  • Inserting via package preserves prices. A package brings its components at their current library prices. Later changes to the package don't ripple into an offer that's already built; use the per-line refresh if you want the newer price.
  • Multi-currency works the same. Additional components inherit the offer's currency.
  • Subsidies are handled separately. Whether an additional component counts toward a subsidy depends on the subsidy and the item, and the subsidy is handled in Reonic's subsidy workflow, not the additional-components section. Ask your Reonic account manager if you're unsure how a specific item is treated.
  • For optional add-ons the customer picks at signing, use Optional components. Items in the Additional components section are always included in the total. To let the customer tick add-ons on or off at signature, use Optional components instead. See Optional components.
  • For a one-off item with no library entry, add a custom line. Enter a title and price inline without a library entry, and it behaves like any other additional component. If you'll add the same custom item repeatedly, promote it to a library component instead.